Sunday, 10 June 2012

After twisting my ankle on the golf course yesterday I spent today unable to walk and there for had some time to do some modeling.

Today I finished the base of my McDonalds. Vollmer put this kit out almost a year ago and I have been waiting to find time to build it. I have the restaurant itself built but I still need to do some detail work. I need to find a place on the layout for it so I can build the drive through, as well as make an out door eating area. I am planning on lighting this building so there are some people in line waiting to place an order. I also need to find more sitting people so they can be eating.  





Tuesday, 24 April 2012

I haven’t had a lot of time to work on the layout but I have started to do some ballast.

I started with painting the track with a mix of Burnt Umber and Burnt Sienna.


After the track was painted I used half light gray and half gray with just a touch of cinders to ballast the track.


After the ballast dried I painted the center of the track to make it dirty and well used. I used a tarnished black wash through out the center of the track. Then a light rust wash on the nail heads of the track. Then I used a eye dropper with a black wash down the middle of the track to look like oil streaks.



Thursday, 26 January 2012

River update and Custom Painting

I haven’t done a lot of work on the layout as of late but I though I would post some new photos. I have added some trees to my river bank and have added a neon sign to my hotel.

I still need to flock some of the trees but I just noticed I only have one colour of grown cover mixed to I will need to get more.




The sign needs to be raised up a little.


I have also had some time to do some painting. Here are some photos of some new stuff.














Saturday, 14 January 2012

the start of a river.

I have started to work on some scenery. On the inside of the U part of my layout I am going to have a river, well it is more of a river bank with just a little water here and there as it winds along the track.

This was easy for me to do because I have a layer of 1½ “ foam on top of my bench work so all I needed to do was cut the corner of the foam off making it easy to contour. After a layer of plaster cloth I applied a layer of plaster to make sure the foam would not come in contact with the woodlands realistic water causing it to bubble.



 After a coating of Woodland slate gray paint I started to apply talus rock in fine and medium gray. To do this on the slop I painted a layer of white glue to hole the talus rock in place. After the glue dried, over night I put a layer of white glue and water mixed over the talus rock to seal it.





I also started to weather and ballast a small section of track. I Started by air brushing everything with rail tie brown. Then I painted some odd ties with a lighter colour of brown to make them look older. After I had the track painted the way I wanted it I added the ballast and used a stiff paint brush to move it around so it looked just as I wanted it. With an eye dropper I put 70% alcohol in between the rails. Once the middle of the track was wet I added the same glue mix. When you add the glue mix in between the rails after the alcohol it flows easy. It also pushes the alcohol out the sides covering all the ballast. I find that if you use to much alcohol it just get pushed out the sides by the glue and makes the surrounding all wet.


After the ballast dried, over night again, I added some fine ground cover to make it look like dead and alive grass. I don’t know if I like the way it looks but we can always pick it off with a knife.


Sunday, 18 December 2011

Pre-Fab and Custom painting update

Since my last post I have done some custom painting and also finished off the Pre-Fab building.

The Pre-Fab building is now ready for the layout. After gluing on all the details I spent some time work on the last of the painting. At some point I will have to weather the building but for now it is done.




Also did some painting over the last few weeks.

First a Via F40PH.





Then 2 CP GP38’s





And 2 Via RDC’s


Saturday, 3 December 2011

Woodlands Scenics Pre-Fab

Have been working on the Woodlands Scenic Pre-Fab Fresh Market kit. For years I have built the DPM buildings with details parts like the night life kit. This kit is really easy to put together. What is tough is the painting just like DPM buildings. The detail parts all have pre-drilled holes and fit easy. I still have some details to add and lots of weathering to do. Not a bad kit for $22.





I have not done a lot of work on the layout lately but I have started to fit building and sper tracks.