CP Flog Subdivision
Saturday, 12 October 2013
Just been working away on the bench work. I hope to get a coat of paint on the back drop before the day is over.
I have also run some house wire and wired up 5 outlets around the layout for power where ever i need it.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)