Thursday, 26 January 2012

River update and Custom Painting

I haven’t done a lot of work on the layout as of late but I though I would post some new photos. I have added some trees to my river bank and have added a neon sign to my hotel.

I still need to flock some of the trees but I just noticed I only have one colour of grown cover mixed to I will need to get more.




The sign needs to be raised up a little.


I have also had some time to do some painting. Here are some photos of some new stuff.














Saturday, 14 January 2012

the start of a river.

I have started to work on some scenery. On the inside of the U part of my layout I am going to have a river, well it is more of a river bank with just a little water here and there as it winds along the track.

This was easy for me to do because I have a layer of 1½ “ foam on top of my bench work so all I needed to do was cut the corner of the foam off making it easy to contour. After a layer of plaster cloth I applied a layer of plaster to make sure the foam would not come in contact with the woodlands realistic water causing it to bubble.



 After a coating of Woodland slate gray paint I started to apply talus rock in fine and medium gray. To do this on the slop I painted a layer of white glue to hole the talus rock in place. After the glue dried, over night I put a layer of white glue and water mixed over the talus rock to seal it.





I also started to weather and ballast a small section of track. I Started by air brushing everything with rail tie brown. Then I painted some odd ties with a lighter colour of brown to make them look older. After I had the track painted the way I wanted it I added the ballast and used a stiff paint brush to move it around so it looked just as I wanted it. With an eye dropper I put 70% alcohol in between the rails. Once the middle of the track was wet I added the same glue mix. When you add the glue mix in between the rails after the alcohol it flows easy. It also pushes the alcohol out the sides covering all the ballast. I find that if you use to much alcohol it just get pushed out the sides by the glue and makes the surrounding all wet.


After the ballast dried, over night again, I added some fine ground cover to make it look like dead and alive grass. I don’t know if I like the way it looks but we can always pick it off with a knife.


Sunday, 18 December 2011

Pre-Fab and Custom painting update

Since my last post I have done some custom painting and also finished off the Pre-Fab building.

The Pre-Fab building is now ready for the layout. After gluing on all the details I spent some time work on the last of the painting. At some point I will have to weather the building but for now it is done.




Also did some painting over the last few weeks.

First a Via F40PH.





Then 2 CP GP38’s





And 2 Via RDC’s


Saturday, 3 December 2011

Woodlands Scenics Pre-Fab

Have been working on the Woodlands Scenic Pre-Fab Fresh Market kit. For years I have built the DPM buildings with details parts like the night life kit. This kit is really easy to put together. What is tough is the painting just like DPM buildings. The detail parts all have pre-drilled holes and fit easy. I still have some details to add and lots of weathering to do. Not a bad kit for $22.





I have not done a lot of work on the layout lately but I have started to fit building and sper tracks.






Wednesday, 16 November 2011

Building

With all the track in place other than the industry siding I though I should start to work on building to use. Over the last few years since I last had a layout set up I have been building buildings for friends to use on there layouts and have gotten a lot better at building. I have pulled all my build building out of storage to see what can be used on the new layout. Most of my old buildings were unpainted when I put them together so I have been painting built building. This is not easy and you should always paint first, also something I have learned since the last layout.


 Here we have the Water Street Freight Terminal. Painted after building



Also Al’s Victory Service had to be painted after it was built.



I wanted to have a nice big corner hotel so I had to bash to DMP kits together. I am planning to light this building and as you can see after I painted on the Blinds from the inside I painted some windows black and left some open so the light will only show through in some rooms. I think it will add to the realism of the building.



I built this small diorama for a friend. It came out so well I just hope I can do it again for my own layout.





I built the DPM Night Life kit and sold it to another friend so I will also have to rebuild this kit as well.