Sunday, 13 April 2014

April Update

Wow I haven't made a post since November. There hasn't been a lot done on the layout because I am still waiting on track and also because we are rebuilding the layout at the club so most of January - March was spent working there.

First I have the layout fully corked and ready for track. Here is a video tour of the layout.


Here is the most current track plan that goes with the video.


I have started to work on building for the layout as well. 

Here is the grain elevator. I am thinking of cutting it down to just 1 loading shed as in real life they would not load 2 at a time like this.



 I am going to have a rundown trailer park in one of the corners this is the first of 7 trailers i need to build.


On the opposite side of the yard will be the city. I have started to build building for here as well. I have also drawn out some streets.



This bridge is near my house and I am using it as the prototype for my bridge scene. Mine will be just a river under the bridge no highway and a double track bridge but you get the idea.




I am also kitbashing 2 George Roberts Printing building into a bigger building. Still working on how that will work.


Finally got my swing down entrance way built. Right now it is nice and stiff and fits well. We will see how it holds up over time.





That is all for now.


Saturday, 16 November 2013


Well golf season ends tomorrow with the closing of the course so that means more time for modelling. The only problem I am having is the lack of Atlas code 55 track. I am waiting on my order and have no idea when I might see it. I only have 3 feet of cookie cut, my lift out to finish and some back drop down the middle to do then all is done until I get track. Here are some pics of what I have so far.




 
I have started to draw out the center lines to see how it will look. Also I can start to lay cork.

Saturday, 12 October 2013


Just been working away on the bench work. I hope to get a coat of paint on the back drop before the day is over.

I have also run some house wire and wired up 5 outlets around the layout for power where ever i need it.
 


 

Saturday, 21 September 2013

More Bench Work

I have been working on my bench work for the last few weeks. I now have the base around the room and the peninsula done.






Also I installed a new TV for when I am working on my layout or at my work desk or as you can see from the lazy chair when I just want to watch football. The chair and foot stool slide under the layout when I am not using them.

Wednesday, 11 September 2013


So after months of planning and with no real timeline on Atlas code 55 track I though it was time to get the bench work built before summer ends and it starts to get cold here in Hamilton Ontario. I have been part of a club that has built 2 large layouts, one with 1x3 pine and one with 3/4 plywood and the plywood layout was 100 % better. It works out to be a little more money but it is so much stronger and easier to work with and you don't have to go through 1000 boards to get 50 that are worth using.

 
We get the lumber yard to rip them in half so they are easier to run through the table saw. It is a little time consuming but the payoffs are in the strength of the bench work and the fact that the plywood will not expand and contract in weather changes like pine will.

 
 
The layout height will be 55" but we built the bench work at 52'' which leaves 3" for rivers and valleys. Most of the layout will be flat but it is always good to have the option. Legs are just made from 2 pieces in an L shape and will have a 45 degree braces to make them sturdier.

 
 


After a days work with a friend that does the ripping and has taught me about wood working I have one section built and installed in the basement. We still have some ripping to do but are well on our way.





Here is a update of the layout plan that I have been working on. My next update will have labels on the plan so you can all see what is going where. I am sure I will change it at least 4 more times before I get any track.



That is all for now. Thanks for looking

Friday, 14 December 2012

I have been working on the plan. Here is a little update. Still more work to do.


Sunday, 11 November 2012

New Layout Planing


Well normally this time of your with the golf season coming to an end I have lots of time to work on my layout. It will be a little different this winter as the wife and I bought a house so I will have room in the basement for a 12x20 layout. I sold what I had done on the old layout to a friend so I am without a layout for the time being. We take possession of the house at the end of the month and then I will have to finish the basement before bench work can start.

Over the last few weeks I have been playing around with AnyRail planning the new layout. I thought I would post a Pic of what I have so far. Keep in mind that this is just the first draft of the track plan. I will work the track plan so that very little track other than the yard is parallel is the front of the layout. Any Ideas are welcome

My plan is to have staging under the layout and to have a modern double track major main line. Lots of trains that run through and or stop to pick up and drop of in the yard during an ops season. I am planning on having 3-5 major industries that will need pick-ups and drop off's. Paper Mill, oil refinery, auto plant and grain for sure. Train length will be based on 24 coal porters with 2 sd40-2, about 10 feet. I will be using Atlas code 55 with a minimum radius of 18”.